Herridge Feedermain
Location: Mississauga, Ontario, Canada
Owner: Region of Peel
Completion Date: March 13, 2010
Category: Tunneling Utility
he construction of 1755m of a 3m dia. tunnel, tunnel entry and exit shafts, two in-line valve chambers. A 2100mm dia. concrete pressure pipe will be installed and backfilled in the tunnel.
Additional Resources:
c380-herridge-feedermain