/*')">*/

Herridge Feedermain

C380 Herridge Feedermain

Location: Mississauga, Ontario, Canada

Owner: Region of Peel

Completion Date: March 13, 2010

Category: Tunneling Utility

he construction of 1755m of a 3m dia. tunnel, tunnel entry and exit shafts, two in-line valve chambers. A 2100mm dia. concrete pressure pipe will be installed and backfilled in the tunnel.

Additional Resources:

c380-herridge-feedermain